        Home / Our Business / Equipment Installation

        Equipment Installation

        CGGC is capable of installing turbo-generator units, electrical and auxiliary equipment of four 1,000MW hydropower projects simultaneously and its business covers various types of turbines such as Francis, axial-flow, pumped storage, tubular, and Pelton.

        In the Three Gorges Project, CGGC created a world record of installing and putting into operation four large units (700MW each) within one year; in recent years, CGGC has installed over 50% of China’s total hydropower capacity, and is the established leader in hydropower unit installation in China and even the world.

         

        Electromechanical Equipment Installation at the Ertan Hydropower Station (China)

        The 550MW water-turbine generator units at the Ertan Hydropower Station had the largest single-unit capacity in China in the twentieth century.

        Read more

         

        Public Utility Installation at the Laxiwa Hydropower Station (China)

        In terms of generating capacity, the Laxiwa Hydropower Station is the largest water power station on the upstream of the Yellow River.

        Read more

         

        Electromechanical Equipment Installation at the Dachaoshan Hydropower Station (China)

        The Dachaoshan Hydropower Station is a national key project in China. CGGC constructed its underground powerhouse and installed the electromechanical equipment.

        Read more

         

        Electromechanical Equipment Installation at the Yixing Pumped Storage Power Station (China)

        With four 250MW pumped storage power units, the Yixing Pumped Storage Power Station is a national key project in China.

        Read more

         

        Electromechanical Equipment Installation at the Bailianhe Pumped Storage Power Station (China)

        As a national key hydropower construction project in China's "11th five-year plan" period, the Bailianhe Pumped Storage Power Station is the first large-scale pumped storage power station owned by the Central China Power Grid.

        Read more

         

        Metal Structure Installation in Cuijiaying Navigation-power Junction Project (China)

        Cuijiaying Navigation-power Junction Project is the first World Bank Loan Project on waterway construction in Hubei Province.

        Read more

         

        Electromechanical Equipment and Metal Structure Installation at Jufudu Hydropower Station (China)

        The Jufudu Hydropower Station is equipped with three 95MW units to reach a total installed capacity of 285MW.

        Read more

         

        Electromechanical Equipment Installation at the Shwegyin Hydropower Station (China)

        CGGC designed, provided and installed four 20MW Francis turbine generator units for the Shwegyin Hydropower Station in Myanmar.

        Read more

         


           2   

         

        Links Privacy Statement Terms of Use Contact Us

        Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

        a级毛片av无码
        • <nav id="c8c2c"></nav>
          • <tfoot id="c8c2c"><noscript id="c8c2c"></noscript></tfoot>
          • <tfoot id="c8c2c"><noscript id="c8c2c"></noscript></tfoot>
          • <nav id="c8c2c"><sup id="c8c2c"></sup></nav>
            <tr id="c8c2c"></tr>