• <nav id="c8c2c"></nav>
      • <tfoot id="c8c2c"><noscript id="c8c2c"></noscript></tfoot>
      • <tfoot id="c8c2c"><noscript id="c8c2c"></noscript></tfoot>
      • <nav id="c8c2c"><sup id="c8c2c"></sup></nav>
        <tr id="c8c2c"></tr>
      • a级毛片av无码,久久精品人人爽人人爽,国产r级在线播放,国产在线高清一区二区

         
         

        Home/Our Business/Equipment Installation

        Electromechanical Equipment and Metal Structure Installation at Jufudu Hydropower Station (China)

        Updated: 2014-04-01

        The Jufudu Hydropower Station is equipped with three 95MW units to reach a total installed capacity of 285MW. CGGC built the catch-water channel and powerhouse, and installed the electromechanical equipment and mental structures of the station.

         

        Links Privacy Statement Terms of Use Contact Us

        Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

        a级毛片av无码
        • <nav id="c8c2c"></nav>
          • <tfoot id="c8c2c"><noscript id="c8c2c"></noscript></tfoot>
          • <tfoot id="c8c2c"><noscript id="c8c2c"></noscript></tfoot>
          • <nav id="c8c2c"><sup id="c8c2c"></sup></nav>
            <tr id="c8c2c"></tr>